|
Frog pond in the making |
Cumulative rainfall of more than 140mm from March 25 to 28, 2014 produced enough runoff at Peacehaven Park to fill the recently built frogpond. TRC staff Wayne and Dan'l handpicked suitable stones and rocks from a rural site then painstakingly sorted and set them to create an attractive and frog-friendly lining. As you can see the pond is full. Subsequent heavy rain on Sunday March 30 should have tested the bywash design. Now all we need are some plants and frogs for a raucous chorus.
|
Filled Frog Pond 27-3-14 |