Sunday 16 September 2012

Changes at Peacehaven

You may have seen some new work being done around the park lately. 

Firstly the mound has been lowered. The peace mound was an important element in stage 1 of Peacehaven's master plan. However after six years of trial and error it was obvious that any water just drained away instantly because the mound was too steep. The new plantings in the peace circle should reinvigorate this part of the park.  
     
The new look for the peace mound.
The mound in 2007
Not looking its best in July 2011
Stump in Time: This is the stump of a large unhealthy gum which was removed for public safety before the park was opened. Its useful life is not over though as The Friends applied for a grant from the Gambling Community Benefit Fund to turn this old giant into a 'time capsule' showing how long large trees take to grow. The surface will be smoothed, oiled and protected, and a number of growth rings labelled with historical events. There will be seats and an information display while the concrete path will allow visitors a closer look. Keep an eye on the progress of this project.

Starting the "Stump in Time" project.

1 comment:

  1. nice blog ....we will wait for your upcoming post...really awesome....thanks for sharing...
    concrete toowoomba

    ReplyDelete